The Bolivarian Government is making progress in paving a section of the Pan-American Highway
Internet
Published at: 20/11/2026 10:22 PM
The paving of the Pan-American Highway, in the direction of Las Tejerías, is still active, between the sections of km 24 and 42, according to the general director of Infrastructure of the Ministry of People's Power for Transport, Gabriel Bolívar, who specified that the work began on November 17 and will last for a month.
He explained that road rehabilitation works include scarifying the pavement, and then placing the new asphalt material, reported the Venezolana de Televisión website.
In this regard, he indicated that the road will be partially closed at night, from 9:00pm to 5:00am, in the stretch from kilometer 24 to 26, and in the daytime, from 9:00am to 5:00pm, from kilometer 26 onwards.
“We urge the population to take their forecasts during the development of the work undertaken by the Ministry of People's Power for Transport, in order to guarantee the smooth and safe mobility of all,” he said.
For the development of road recovery work, the National Executive's Transportation portfolio uses specialized heavy machinery for the removal of deteriorated asphalt material, as well as for the installation of new material, in addition to dump trucks and basic tools.
The optimization of the Pan-American Highway corresponds to the work plan being carried out by the national Government, led by the President of the Republic, Delcy Rodríguez, with the support of the governor of the state of Miranda, Elio Serrano, as part of the Second Transformation of the 7T, Human Cities for Good Living, with the purpose of offering a safe road network to the population.
Mazo News Team