Navigator

Search


Sector Vice President Ramírez inspected water recovery works in El Guri

The authorities reviewed the plant's operating parameters
VTV photo

Published at: 15/11/2026 03:05 PM

The sector vice-president of Public Works and Services, Juan José Ramírez, inspected the water recovery and maintenance work of the Simón Bolívar Hydroelectric Power Plant (El Guri), located in Bolívar state, as part of the actions to strengthen the National Electric System (SEN).

The tour was attended by representatives of the Ministry of People's Power for Electric Energy and the operational team of the National Electric Corporation (CORPOELEC).

During the day, the authorities reviewed the plant's operating parameters and evaluated preventive and corrective maintenance strategies to ensure its operability.

“We are still deployed in the territory, guaranteeing the stability and strengthening of our energy system for the well-being of the Venezuelan people,” Ramírez said.

VTV/Mazo News Team