Navigator

Search


President Maduro handed over the fully rehabilitated “Fabrico Ojeda” Endogenous Development Center

The spaces were rehabilitated by the organized Popular Power and the Mayor's Office of Caracas
@PresidencialVen

Published at: 27/12/2023 06:03 PM

The President of the Republic, Nicolás Maduro, led the working day, on the occasion of the delivery of the “Fabrico Ojeda” Endogenous Development Center, to which all its spaces were rehabilitated by the organized Popular Power and the Mayor's Office of Caracas.

During the tour of the facilities of the Center for Endogenous Development “Fabricio Ojeda”, the head of state was accompanied by the mayor of Caracas, Carmen Meléndez and the head of government of Caracas, Nahun Fernández and other authorities of the Bolivarian Government.

He commented that during the day it was planned to deliver a total of 360 Socialist Mission Bases.

This Nucleus is coordinated by the Presidential Committee, composed of the Mayor's Office of the Libertador municipality and the Ministries of Popular Power for Habitat and Housing; and Petroleum.

The rehabilitation covered 16 hectares through the intervention of four axes: urban equipment, public services, productivity and mobility and integration, which, at the same time, comprise 21 sectors.

In addition, based on the joint work of 750 workers and 44 State entities, works associated with the integration and habitability of the NUDEFO were carried out, including areas of functional integration, security (Peace Quadrants), beautification (landscaping) and organization.

The NUDEFO comprises 38 communal councils, distributed in four communes, and 12,503 families. Among the intervened spaces, there are the “Monsignor Ramón Inocente Lizardi” National Educational Unit (construction, rehabilitation of sanitary rooms and provision of equipment and furniture), Gramoven Popular Clinic and “Federico Quiroz” Integral Rehabilitation Room (SRI). In the last two, general roof waterproofing, painting, plumbing, electrical system and air conditioning were carried out.

Simultaneously, the construction of the “Robert Serra” Sports Complex was completed, which includes a smaller baseball and softball field of 2,930 square meters, as well as new spaces for training and recreation.



Mazo News Team