Navigator

Search


National government has removed 1.43 million tons of debris in La Guaira

Debris collection in La Guaira
Internet

Published at: 17/11/2026 06:46 PM

The sector vice president of Public Works, Juan José Ramírez, reported that more than 1,430,000 tons of debris have been removed in La Guaira as part of the recovery efforts following the double earthquake of June 24, while 282 buildings have been demolished as part of the Venezuela Renace Plan.

During a supervisory day in Catia La Mar, Ramírez verified the deployment of 75 work fronts dedicated to demolition, collection and removal of debris, highlighting that the volume of material removed represents 68% of the established goal, calculated on an estimated 2 million 100 thousand tons of debris generated by seismic movements.

To advance these tasks, heavy and explosive machinery is used in the controlled demolition procedures of structures that require intervention.

The collected material is also treated for use and subsequent reintegration into the construction sector, as part of the actions planned for the recovery of affected areas.

Mazo News Team