Nahum Fernández: Asphalting and construction work is progressing at Cota 905
Nahum Fernandez Instagram
Published at: 09/10/2026 06:47 PM
The Head of Government of Caracas, Nahum Fernández, reported on the deployment on the main street of the Moscow neighborhood, in Cota 905, El Paraíso parish, “where we have carried out a fruitful inspection with @e_cazahueco, to positively impact the La Espada de Bolívar Community Circuit”.
In this regard, in his account on the social network Instagram, he specified that 2,200 m² of asphalt layer had been demolished, and 1,436 m³ of rubble collected and disposed of.
“Now 480 m³ of concrete with a thickness of 20 cm is being emptied to begin the construction of this road, benefiting 360 families from the point and circle, as instructed by the president in charge @ delcyrodriguezv,” he said.
Fernández pointed out that “this land was deteriorated, so we sent the Hole Hunting Squadron teams made up of engineers, workers and specialists who handle heavy machinery to build in these spaces a beautiful road similar to the streets of a boulevard that also have brothels to ensure better protection and durability of the slope.”
He added that “in the face of an earthquake, the road will be maintained in accordance with the safety protocols they have implemented. In addition, we are placing our own cement, made by @g obdecaracas”.
“Together with the deputy @arangurenalex1 and the People's Power, we also remember a tremendous house-to-house day that we celebrated hand in hand with the grandparents and grandmothers of the Fatherland and the ever consistent youth. And today, we have instructed maximum protection for everyone with an extraordinary deployment of social care for the Moscow sector,” he stressed.
Mazo News Team