Navigator

Search


Minister Rolando Alcalá supervised the operation of electrical substations in Portuguesa

The authorities evaluated the operating conditions of the strategic facilities for the transmission and distribution of energy
Ministry of People's Power for Electric Energy

Published at: 21/11/2026 08:37 PM

The Minister of Popular Power for Electric Energy, Rolando Alcalá, together with the president of the National Electric Corporation (CORPOELEC), Juan Fernández, inspected the Acarigua I and II Substations in the Portuguese state to evaluate and strengthen the infrastructure of the National Electric System (SEN).

During the tour of the substations, the authorities evaluated the operating conditions of the strategic facilities for the transmission and distribution of energy, reaffirming their commitment to the modernization of the SEN and the quality of the electricity service for the Portuguese people.

These technical sessions make it possible to optimize the capacity to respond to possible incidents in high and medium voltage networks in the plain region.

With preventive maintenance and the adaptation of power equipment, the CORPOELEC workforce team seeks to guarantee the stability of the electrical service at the national level.

Mazo News Team