Navigator

Search


MINAGUAS successfully completed optimization of the Tulé water system in Zulia

The actions focus on the stabilization and comprehensive improvement of the service.
Ministry of Water

Published at: 13/10/2026 05:53 PM

The Ministry of the People's Power for Water Care (MINAGUAS), with the firm intention of optimizing the drinking water distribution system that provides care for 600,000 families in the state of Zulia, repaired a fault in the reduction of the Tulé pumping station from 120 to 72 inches.

The Multidisciplinary Water Team was quickly deployed to intervene the incidence in pipes of 120 and 72 inches in diameter, allowing an immediate improvement in the pressure of the water resource.

The actions focus on the stabilization and comprehensive improvement of the service, from the sources of collection to the final distribution points, the ministerial body reported on its website.

After the incident was detected, the HIDROVEN crew quickly moved to the site, starting the welding work for 24 continuous hours. In addition, using heavy machinery such as jumbo and backhoes, to ensure impeccable work.

In compliance with the guidelines of the President of the Republic, Delcy Rodríguez, to provide an efficient and reliable service, MINAGUAS consolidates the maintenance and optimization of water systems in Zulia.

Mazo News Team