Navigator

Search


CORPOELEC installs transformers in municipalities in the state of Miranda


Photo: Social networks

Published at: 12/11/2026 12:01 PM

Operators from the National Electric Corporation (CORPOELEC) installed three transformers in the Paz Castillo and Simón Bolívar municipalities of Miranda state.

Two 37.5 kVA devices were located in the Los Añiles community to bring energy to 120 homes and to the Argenis Salvador Medina Educational Unit, belonging to the San Francisco de Yare parish.

In parallel, in the parish of Santa Lucía, power equipment with a capacity of 37.5 kVA was installed in the El Nogal sector.

The operators also replaced fuses, lightning rods, power cutters and measured voltage levels, with the objective of maintaining electrical service in these tuyera areas.

These works are carried out with the purpose of continuing to optimize the National Electric Service.



Mazo News Team