Navigator

Search


CORPOELEC installed two new 37.5 kVA transformers in the El Jebe community in Lara

CORPOELEC optimizes electricity service for more than 80 families in the El Jebe sector of Barquisimeto
Photo: Social networks

Published at: 16/11/2026 09:59 AM

The National Electric Corporation (Corpoelec) installed two new transformers of 37.5 kVA each in sector 19 de Abril Concepción 1, belonging to the El Jebe community, located in the Catedral parish of the Iribarren municipality, Lara state.

With these tasks, the state power company guarantees the continuity and stability of the energy supply for more than 80 families that reside in this area in the northwest of the capital of Larense.

During the operational deployment, the technical crews carried out the assembly and adjustment of both equipment, in addition to the adaptation of the protection systems, the cabling and the corresponding grounding to ensure the optimal functioning of the network.

For her part, Marisol Álvarez, a resident of the community, thanked the execution of these works, highlighting the positive impact it represents for the daily well-being of the residents of the sector.

With these actions, CORPOELEC reaffirms its commitment to strengthening the National Electric System (SEN) and providing timely and efficient care to communities in Larense, guaranteeing service throughout the entity.



Mazo News Team