Navigator

Search


Bolivarian Government rehabilitated the Bridge over Lake Maracaibo

The reopening took place with lights that filled the Zulian family with joy
Screenshot

Published at: 18/11/2024 09:23 AM


The president of the Corporation for the Development of the Zulian Region (CORPOZULIA), Néstor Reverol, reported that the G/J Rafael Urdaneta Bridge has been rehabilitated.

“On instructions from President Nicolás Maduro and as a gift to the Zulian people on the 315th anniversary of the apparition of Our Lady of the Rosary of Chiquinquirá, we handed over the fully rehabilitated G/J Rafael Urdaneta bridge, after two uninterrupted years of work by the Bolivarian Government, ” Reverol said through the social network Threads.

In this regard, he specified that the reopening took place with lights that filled the Zulian family with joy.

“Likewise, with the patriotic colors, we illuminated this icon that represents the progress of the region and the country. As Zulians, we proudly say that long live the Lake, China and the Bridge!” , he emphasized.

Mazo News Team