Government of Barinas began the recovery of the Chiquimbuy suspension bridge
Internet
Published at: 20/11/2026 05:31 PM
With the replacement of guayas and the leveling of its main structure, work began to rehabilitate the suspension bridge over the Santo Domingo River, a vital work for the mobility of the inhabitants and producers of Chiquimbuy, in the San Isidro sector of the Altamira parish, a jurisdiction that has more than 3,700 inhabitants in the Bolívar municipality of the state of Barinas.
The works are carried out directly by the community council of the area, after receiving approval of resources through the Interterritorial Compensation Fund (FCI), following efforts promoted by the governor of the entity, Adán Chávez before the Federal Government Council, reported the Última Noticias portal.
During a technical inspection at the site, the Executive Secretary of Infrastructure and Territorial Planning (SIOT), Dayan Guedez, reported that engineers Rafael Colmenares and Aníbal Medina, accompanied by Civil Protection and neighborhood leaders, verified the replacement of the tensioning cables on the right side and the placement of steel supports on the porches.
The maneuvers also included reinforcing the anchors with two-inch steel bars and tensioning them with ladies to bring the bridge deck back to its original position, ensuring that the infrastructure returns to operating under optimal conditions in the short term after being affected by rainfall.
Mazo News Team